November 19, 2026
Hyde Park's largest residential plan sits on 339.5 acres east of Route 9, between St. Andrews Road and West Dorsey Lane, across from the Culinary Institute of America. It is called Bellefield, and its approved plan has 801 homes. Most of them are condos, townhouses, duplexes and apartments, the housing types that have been hardest to find across Dutchess County this year. According to the town's own records, those homes are still working their way through the Hyde Park Planning Board. If you're comparing Hyde Park with other towns this winter, Bellefield tells you something about the town's future. Your choice today is still among the homes already standing, and that matters most if you want a condo or townhouse.
The first finished building is a hotel. The Inn at Bellefield is a 137-room Residence Inn developed by Shaner Hotel Group, and Westfair Communications reported its ribbon-cutting in May 2024. The same coverage described a second hotel, an event venue and more than 10 miles of trails as later parts of the plan.
Route 9 has also changed around the site. In July 2026, Think Dutchess reported that the former Stop & Shop in Hyde Park had been turned into Dassai Blue's 55,000-square-foot sake production site, with a tasting room for visitors. The same article called Bellefield a $1 billion mixed-use development whose plan includes hotels, food-related retail and restaurants, residences, trails and open space.
So a buyer driving this stretch of Route 9 sees a corridor that is already changing. The homes are the next layer, and they move on a different calendar.
The Town Board's 2021 amended concept plan sets out Bellefield's homes by type. In May 2026, the master developer, T-Rex Hyde Park Owner, LLC, asked for an adjustment that shifts some cottage and patio homes into townhouses and keeps the total at 801.
| Home type | Approved in 2021 | Proposed in May 2026 |
|---|---|---|
| Estate homes | 30 | 30 |
| Cottage homes | 58 | 50 |
| Condo units | 129 | 129 |
| Duplex/patio homes | 80 | 68 |
| Townhouse-style units | 160 | 180 |
| Apartments | 344 | 344 |
| Total | 801 | 801 |
Only 88 of the 801 are detached single-family homes: the estate and cottage homes together. The town's findings statement says 120 of the 344 apartments would sit above retail and 224 would be in freestanding buildings. The May 2026 request would push the plan further toward attached homes with shared walls. That is the part of Bellefield a downsizer or a first-time condo buyer would be watching.
Bellefield began as St. Andrew's PUD. The Town Board approved that original concept on August 29, 2007, and T-Rex submitted an amended concept plan in September 2020. Since then, the residential pieces have come before the Planning Board one phase at a time.
The first homes in line are 12 townhouses, plus an entry barn, in a phase called Phase 2A. The Planning Board gave Argo Development and Construction conditional site plan approval for them on November 15, 2023. On February 19, 2025, the board voted 7 to 0 to give the project two more years to start and finish construction, through February 28, 2027. The developer markets these homes as The Townhouses at Bellefield and describes 12 luxury townhomes. Interested buyers are asked to contact the developer directly, with no prices posted.
The larger condo phase came next. On May 19, 2026, T-Rex filed its Phase 4B plan: 129 condominium units in four buildings, eight three-story townhouses and a pond, along with the preliminary subdivision for Phases 4 and 5. The Planning Board's June 3, 2026 agenda listed the Phase IV condos and the Phase 4 and 5 subdivision as workshop items.
Here is where Bellefield matters for a buyer comparing towns now. In OneKey MLS figures for Dutchess County in the third quarter of 2026, the median condo sale price was $395,000. That was up 21.5% from the same quarter in 2025, with 2.5 months of supply. Single-family homes in the same quarter had a $547,700 median, up 10.3% year over year, with 4.5 months of supply and an average of 51 days on market.
Condo supply in the county ran well under that single-family figure. September 2026 looked the same: 63 condos for sale countywide, 31 closed condo sales for the month and a $415,000 median, against 763 single-family homes for sale.
Put the two together. More than 700 of Bellefield's approved homes are attached homes or apartments, the same types that are scarcest in the county's sales figures. Once built, they would add a meaningful number of condo and townhouse options to Hyde Park. Until a phase is approved and built, they add none, and a buyer who needs a condo or townhouse in the next year is competing for the small number of resale units on the market today. Single-family buyers are in a different spot. Bellefield was never going to add many detached houses, so their search in Hyde Park looks the same with or without it.
These are county figures, not Hyde Park figures. They describe the market Hyde Park competes in, and they show which kinds of homes are hardest to find.
Bellefield is not the only long-planned project on the Planning Board's desk. Crofton Mews is a multifamily residential development at 1269 Route 9G, on a 55.55-acre parent parcel. Its findings statement dates to October 13, 2003. The property owner and applicant is Elbow Creek LLC.
An application filed on October 6, 2026 says the Planning Board approved the development in March 2025 and asks to move its approved wastewater treatment plant to a new spot on the site. State permits for the site's wetlands, streams and discharge were issued in early 2025. Like Bellefield, Crofton Mews is a Route 9G and Route 9 story of multifamily housing that has been planned for many years and is still moving through review.
If Hyde Park is on your list and timing matters to you, these are the items on the town's record to follow:
The Town of Hyde Park posts Planning Board agendas and filings on its website. Following those agendas tells you more about the timing of new homes in Hyde Park than the activity you can see from Route 9.
For a single-family buyer, Hyde Park this winter is the town as it stands: its existing homes along Route 9, Route 9G and the roads between them. If an older house appeals to you, our guide to buying a historic home in Hyde Park covers that part of the market, and the Hyde Park neighborhood page gives an overview of the town.
A condo or townhouse buyer, or a downsizer hoping for one-level living without leaving town, has two timelines to weigh. One is the county's resale market, where condo supply has been running at about two and a half months. The other is Bellefield's approved plan, which would add a large share of exactly those home types once its phases are approved and built. If you need to move within the coming year, the resale market is the one you'll be buying in. If your timing is flexible, Bellefield's next Planning Board steps are worth following.
Owners of condos and townhouses already standing in and around Hyde Park are in a position worth understanding. Until new supply arrives, they own the type of home Dutchess County buyers have had the hardest time finding this year.
If you own a home in Hyde Park and want to know how today's tight condo and townhouse supply affects its value, or you're weighing whether to buy now or wait for Bellefield's next phase, Debra Allan has worked Dutchess County since 1994 and can walk you through it with your own numbers. Request a free home valuation and we'll go over it together.
I am ready to work with you to help you sell or buy a home! So whether you are a first time buyer, relocation buyer, investor, moving up or downsizing...I am ready to roll up my sleeves to go to work for you! Make your next move with Debbie Allan!